Granite Rd Bridge is CLOSED by order of NH DOT. Seek alternate route.
To report road problems, please call the town office at 539-7770 or send an EMAIL. If there is an emergency road issue, please call Carroll County Dispatch at 539-5380. Thank you.
Request for Proposal – Elm Street Paving 2023
Contractors Meeting January 3, 2023 at 11:00 a.m. Bid due January 9, 2023 at 2pm Elm Street Paving RFP
Bailey Road Culvert Field Reports
RFP Scope of Work for the 2022-2023 road contract
Province Lake Outlet Culverts
Here is the LINK to the report on the assessment of improvements at the Province Lake outlet culvert at Bailey Road in Effingham. The report documents and completes the evaluations and recommendations. It includes a summary report, and supporting reports by Streamworks, and DK Water Resources Consulting. The report includes the set of conceptual design drawings, including full existing conditions plan and wetlands delineation, and a project cost estimate.
Snow Rd Bridge complete. Snow Rd Paving complete.
DETOUR VIA COLCORD HILL ROAD. Snow Rd Bridge Engineering Reports with Photographs: 05.21.2021, 05.25.2021, 05.26.2021, 05.27.2021, 05.28.2021, 06.01.21, 06.02.21, 06.03.21, 06.07.21, 06.08.21, 06.10.21, 06.11.21, 06.14.21, 06.15.21, 06.16.21, 06.17.21, 06.21.21, 06.24.21, 06.28.21, 06.29.21, 06.30.21, 07.06.21, 07.07.21, 07.09.21, 07.12.21, 07.13.21
Elm St. Bridge Completed Nov. 2020 – Engineering Reports: 11.16.20, 11.10.20, 08.26.20, 08..24.20, 08.21.20, 08.20.20, 08.19.20, 08.17.20, 08.14.20, 08.13.20, 08.11.20, 08.07.20, 08.04.20, 07.30.20, 07.29.20, 07.27.20, 07.24.20, 07.23.20, 07.20.20, 07.16.20 , 07.13.20 , 07.07.20
Green Mountain Road multi-year reconstruction project: 2018 – 2019 included culverts. Paving scheduled for 2020, completed August 2020. Next steps TBD. Paving completed in 2022.
Selectmen’s Sept. 2019 Snow Road Bridge Project Presentation
NH DOT Bridge Inspection Reports:
Link: Guide to NH Road and Highway Laws
Link: 2019 DOT Bridge Report
Link: 2017 DOT Bridge report
Link: 2015 DOT Bridge Report
Link:Municipal Bridge Structural Assessment Report HEB 12-01-15
Link: 2013 Townwide Road Maintenance Assessment
Link: 2006 Effingham Culvert Study